- Overview of the situation
- Specific problems
- Windstorm damages repair
- Buy Facilities Management paper online
- Table 1
- Storm damage repair recommendations
- Cost allocation recommendations
- Safety issues
- ADA compliance
- Proposed CPP analysis
- Room renovations
- Table 3
- Rooms renovation items
- Equipment
- Table 4
- Equipment expenses
- Premises Renovation Projects
- Table 5
- Premises renovation projects
- Recommended operational costs
- Table 6
- Recommended operational costs
- Summary
- Table 7
- The Desert Volcano Lodge: Revised 2013 Capital Project Plan
- Related Management essays
Overview of the situation
We will prioritize the projects basing on the analysis of the Desert Volcano Lodge performance in 2012. In the last quarter of 2012, many repair issues originated, so the existing capital project plan needs revision.
For the year 2012, the Desert Volcano Lodge has improved its performance relative to occupancy (+6.9%), ADR (+9.4%), and RevPAR (+14%) comparing to 2011. The Desert Volcano Lodge performance is better than for the competitive properties.
We consider the 2013 aim is to improve the performance of 2012. The reconstruction and repair work will include the windstorm damages repair, the renovations for compliance with Americans with Disabilities Act (ADA), the facilities improvement for safety and guests’ comfort issues.
Specific problems
Windstorm damages repair
Allen Building Consulting gave the recommendations for the issues of storm damage repair, safety and ADA compliance. Table 1 presents the recommendations for storm damage repair and its analysis. In Table 2, we listed recommendations for cost allocation.
Table 1
Storm damage repair recommendations
Issue | Recommendation | ||
Allen Building Consulting repair, cost | Allen Building Consulting replacement/renovation, cost | Asset management firm | |
Roof | Spot repairs $2,000 |
Roofing replacement $90,000 (asphalt shingle) $135,000 (metal roofing) |
Roofing replacement |
West side exterior walls | Spot repairs $500 |
Tuckpointing the entire building $40,000 |
Tuckpointing the entire building |
Interior damage | Wall and ceiling repair $2,500 |
n/a | Wall and ceiling repair |
Landscape and outbuilding damage | Shed repair $6,000 Snow blower repair $1,200 |
n/a | Shed and snow blower repair
|
Table 2.
Cost allocation recommendations
Issue | Estimated cost (EC) | Insurance deductible (ID) | Covered by insurance (CI = EC – ID) |
Interior damage | $2,500 | $1,000 | $1,500 |
Outbuilding damage | $7,200 | $1,000 | $6,200 |
Total | $2,000 | $7,700 |
The Western Partners have to pay $2,000 as insurance deductible to interior damages repairs. Since the masonry of the building has never been maintained, it is reasonable to allocate the capital investment for this issue. The entire building tuckpointing requires $40,000. We recommend installing reliable metal roofing system instead of roof spot repair. This would allow making further investment in room renovations and improvements for the next periods. The estimate for roof replacement is $135,000. This amount will be included in the Capital Project Plan (CPP) for 2013, along with the tuckpointing expenses.
Although Allen Building Consulting gave notice about a possible rise in insurance premium of 3-4%, we recommend filing a claim as insurance covers $7,700, while possible premium rise is $2,700 at maximum.
The Hotel Management should include costs for landscape renovation since this is not covered by insurance. Landscape renovation is operational cost and will not be included to CPP. We suggest allocating $1,500 for landscape renovation during the next 3 years.
The repair issues discussed in this section influence the facility performance and resort occupation. We strongly recommend Western Partners to address these issues in 2013 to improve the resort performance at the level of 2012.
Safety issues
The Allen Building Consultant identified a slippery floor issue in the lobby area. As for 2013, we do not recommend renovations in this field, due to many other renovation commitments. This may be included in the CPP for 2014.
We advise replacement of the kitchen hood systems as recommended by Fire Department.
ADA compliance
We recommend performing the alternations for ADA compliance. These are swimming pool lifts installation, public restrooms alternation and guestroom bath changes.
Proposed CPP analysis
Room renovations
Table 3 presents the analysis of the items that the High Country Management defined as renovation priority.
Table 3
Rooms renovation items
Item | Cost | Include in CPP for 2013 |
Soft goods for 17 guest rooms | $37,400 | Yes |
Guestroom window replacement | $25,000 | Yes |
Handicapped guestroom bath changes | $20,000 | Yes |
Guestroom baths - curved shower rods | $15,000 | No |
New televisions (165 ea) | $36,300 | No |
New rollaway beds (5 ea) | $3,000 | Yes |
New PTAC's (75 ea) | $40,000 | No |
New microwaves (10 ea) | $3,000 | Yes |
The room renovation is necessary to ensure quality service and improve the resort performance. However, some renovations are out of scope for 2013 since much repair works are demandable.
The replacement of windows in guestrooms is not only a renovation, but also an energy-efficient issue. The bath upgrade in guestrooms of the old building is ADA compliance. We consider reasonable to install new rollaway beds since customers complain about existing, so this will be the contribution to performance improvement. Since microwaves repair is only $460 cheaper than new microwaves, we approve the microwaves replacement.
Curved shower rods would only add upscale appearance to bathrooms. Since there were no complaints from customers about the shower rods, we consider change superfluous. New televisions are out of scope for 2013. Although PTAC’s are old, they function and do not require repair. We recommend excluding the PTAC’s replacement from CPP.
It is unreasonable to invest $76,300 for PTAC and televisions when roof replacement is needed.
Soft goods renovation is $37,400 for 17 rooms, or $2,200 for one room. If it is necessary to meet the proposed CPP plan limit, we may recommend renovation for 10, 15, or another quantity of rooms.
Equipment
This section analyses the expenses for the equipment used outside the guestrooms (Table 4). Some of the items are operations expenses, and the table indicates that.
The items identified as operational expenses should be included in operational expenses (repairs & maintenance expenses).
Table 4
Equipment expenses
Item | Cost | Capital or operational expense | Include in CPP for 2013 |
Guest coin-op laundry equipment | $4,500 | Capital | No |
Waterpark ozone system | $15,000 | Capital | No |
Kitchen grill | $1,800 | Operational | Yes |
Fire system - kitchen hood | $11,000 | Capital | Yes |
Sewage ejection pumps | $1,500 | Operational | Yes |
Guestroom corridor ice machines (5 ea) | $12,000 | Capital | Yes |
Customers do not complain about guest coin-op laundry equipment, so we consider calling off this investment. Waterpark ozone system (chlorine system replacement by ozone) is a local initiative; the old system functions properly. For 2013, due to repair works, this is annulled.
Benefit from Our Service: Save 25% Along with the first order offer - 15% discount, you save extra 10% since we provide 300 words/page instead of 275 words/page
Kitchen grill and sewage ejection pumps can be designated as operational expenses since they are under the capital expenses threshold. However, we do recommend repairing these items in 2012.
Fire systems replacement is a part of the safety issue recommended by Fire Department. Many guests use ice machines, so these have to operate properly, and their repair is almost 60% of the new item price, so investment for the new ice machines is more efficient.
Premises Renovation Projects
The High County Management proposes several renovations. Some of them are ADA alternation; one is repair of the faulty structures while others are interior renovations. Table 5 lists the summary of the projects and recommendations.
Porte cochere repair is necessary as the structures are falling, and this is a safety issue. Partially, this is the appearance update. The main reason we insist on money allocation to this issue is safety.
We recommend swimming pool lifts installation and public restrooms alternations. These projects are due because of ADA regulations.
Table 5
Premises renovation projects
Item | Cost | Include in CPP for 2013 |
Porte cochere | $20,000 | Yes |
Swimming pool lifts | $18,000 | Yes |
Public restrooms alternations | $50,000 | Yes |
Elevator interior | $19,000 | No |
Restaurant soft innovation | $40,000 | No |
Elevator interior and restaurant soft innovation are appearance issues. Hotel performance did not show any decrease in 2012, we presume that customers still value resort amenities. These innovations may be addressed in the next period since the other priorities are set for 2013.
VIP services
extended REVISION from - $2.00
SMS NOTIFICATIONS from - $3.00
Proofread by editor from - $3.99
by Top 30 writers from - $4.80
PDF plagiarism report from - $5.99
VIP Support from - $9.99
PACKAGE from - $23.82
Recommended operational costs
We recommended some issues to be addressed as operational costs in 2012. Kitchen grill and sewage ejection pump repair have been reallocated from CPP. We recommend including landscape renovation as it was damaged during the storm. We present data in Table 6.
Table 6
Recommended operational costs
Item | Cost |
Kitchen grill repair | $1,800 |
Sewage ejection pumps repair | $1,500 |
Landscape renovation | $1,500 |
Total | $4,800 |
Summary
Analysis of the current situation of the Desert Volcano Lodge proves that proposed by High Country Management 2013 CPP requires revision. This is mainly due to storm damages and cost misallocation.
We reallocated the kitchen grill and sewage ejection pumps repair to operational costs.
Storm damaged the roof, caused water infiltration into interior walls, damaged guestrooms, landscapes and outbuilding. We recommend installing new metal roofing and tuckpointing the entire old building instead of spot repairs. If Western Partners plan to hold the resort, this is a reasonable investment. For the other damages, file an insurance claim, pay $2,000 deductible and insurance will cover $7,700 for the interior and outbuilding repair. Western Partners will have to allocate $1,500 for landscape renovation as operational cost for 3 years, approximately.
Top 30 writers
Your order will be assigned to the most experienced writer in the relevant discipline. The highly demanded expert, one of our top-30 writers with the highest rate among the customers
We suggest approving the items that are ADA compliance (swimming pool lifts, public restrooms alternations, handicapped guestroom bath changes) and Fire Department recommendations (fire system).
The other items in the Revised 2013 CPP are items that provide performance improvement. We reconsidered the items proposed by High Country Management and chose the items with the highest priority. The details are discussed in the appropriate sections of the report.
We aimed at meeting the total of High Country Management CPP. Table 7 presents the Desert Volcano Lodge revised 2013 Capital Project Plan.
Table 7
The Desert Volcano Lodge: Revised 2013 Capital Project Plan
Item | Original Installation Date |
Cost | Comments |
Metal roofing system installing | 1985 | $135,000 | Metal roofing provides benefits for the property, reasonable long-term investment |
Tuckpointing the entire building | n/a | $40,000 | Tuckpointing prevents water infiltration into the interior walls. |
Porte Cochere | 1993 | $20,000 | Replacement of the falling structures, update appearance |
Swimming pool lifts | n/a | $18,000 | ADA compliance |
Public restrooms alternations | n/a | $50,000 | ADA compliance |
Soft goods for 16 guest rooms | 2003 | $35,200 | Performance improvement. The amount was reduced to meet the CPP total, only 16 rooms will be renovated. |
Guestroom window replacement | 1985 | $25,000 | Performance improvement, energy-saving issue |
Handicapped guestroom bath changes | 1985 | $20,000 | ADA compliance |
Guestroom corridor ice machines (5 ea) | 1981/2003 | $12,000 | Performance improvement |
Fire system - kitchen hood | 1979 | $11,000 | Fire Department recommendations |
New rollaway beds (5 ea) | 1983 | $3,000 | Performance improvement |
New microwaves (10 ea) | 1985 | $3,000 | Performance improvement |
Contingency | $2,000 | ||
Total | $374,200 |
The revised CPP will restore the areas damaged by storm, significantly renovates the old building and improve performance of the resort in 2013.