Live chat Call back Call back
Order now
Facilities Management

Overview of the situation

We will prioritize the projects basing on the analysis of the Desert Volcano Lodge performance in 2012. In the last quarter of 2012, many repair issues originated, so the existing capital project plan needs revision.

For the year 2012, the Desert Volcano Lodge has improved its performance relative to occupancy (+6.9%), ADR (+9.4%), and RevPAR (+14%) comparing to 2011. The Desert Volcano Lodge performance is better than for the competitive properties.

We consider the 2013 aim is to improve the performance of 2012.  The reconstruction and repair work will include the windstorm damages repair, the renovations for compliance with Americans with Disabilities Act (ADA), the facilities improvement for safety and guests’ comfort issues.

Specific problems

Windstorm damages repair

Allen Building Consulting gave the recommendations for the issues of storm damage repair, safety and ADA compliance. Table 1 presents the recommendations for storm damage repair and its analysis. In Table 2, we listed recommendations for cost allocation.

 

?
?
?
?
?
?
?
?
Order now

 

Table 1

Storm damage repair recommendations

Issue Recommendation
Allen Building Consulting repair, cost Allen Building Consulting replacement/renovation, cost Asset management firm
Roof

Spot repairs

$2,000

Roofing replacement

$90,000 (asphalt shingle)

 $135,000 (metal roofing)

Roofing replacement
West side exterior walls

Spot repairs

$500

Tuckpointing the entire building

$40,000

Tuckpointing the entire building
Interior damage

Wall and ceiling repair

$2,500

n/a Wall and ceiling repair
Landscape and outbuilding damage

Shed repair

$6,000

Snow blower repair

$1,200

n/a

Shed and snow blower repair

 

 

Table 2.

Cost allocation recommendations

Issue Estimated cost (EC) Insurance deductible (ID)

Covered by insurance

(CI = EC – ID)

Interior damage $2,500 $1,000 $1,500
Outbuilding damage $7,200 $1,000 $6,200
Total   $2,000 $7,700

 

The Western Partners have to pay $2,000 as insurance deductible to interior damages repairs. Since the masonry of the building has never been maintained, it is reasonable to allocate the capital investment for this issue. The entire building tuckpointing requires $40,000. We recommend installing reliable metal roofing system instead of roof spot repair. This would allow making further investment in room renovations and improvements for the next periods. The estimate for roof replacement is $135,000. This amount will be included in the Capital Project Plan (CPP) for 2013, along with the tuckpointing expenses.

Limited time Offer

0
0
days
:
0
0
hours
:
0
0
minutes
:
0
0
seconds
Get 19% OFF

Although Allen Building Consulting gave notice about a possible rise in insurance premium of 3-4%, we recommend filing a claim as insurance covers $7,700, while possible premium rise is $2,700 at maximum.

The Hotel Management should include costs for landscape renovation since this is not covered by insurance. Landscape renovation is operational cost and will not be included to CPP. We suggest allocating $1,500 for landscape renovation during the next 3 years.

The repair issues discussed in this section influence the facility performance and resort occupation. We strongly recommend Western Partners to address these issues in 2013 to improve the resort performance at the level of 2012.

 

Safety issues

The Allen Building Consultant identified a slippery floor issue in the lobby area. As for 2013, we do not recommend renovations in this field, due to many other renovation commitments. This may be included in the CPP for 2014.

We advise replacement of the kitchen hood systems as recommended by Fire Department.

 

ADA compliance

We recommend performing the alternations for ADA compliance. These are swimming pool lifts installation, public restrooms alternation and guestroom bath changes.

 

Proposed CPP analysis

Room renovations

Table 3 presents the analysis of the items that the High Country Management defined as renovation priority.

 

Table 3

Rooms renovation items

Item Cost Include in CPP for 2013
Soft goods for 17 guest rooms $37,400             Yes
Guestroom window replacement $25,000 Yes
Handicapped guestroom bath changes $20,000 Yes
Guestroom baths - curved shower rods $15,000 No
New televisions (165 ea) $36,300 No
New rollaway beds (5 ea) $3,000 Yes
New PTAC's (75 ea) $40,000 No
New microwaves (10 ea) $3,000 Yes

 

The room renovation is necessary to ensure quality service and improve the resort performance. However, some renovations are out of scope for 2013 since much repair works are demandable.

The replacement of windows in guestrooms is not only a renovation, but also an energy-efficient issue. The bath upgrade in guestrooms of the old building is ADA compliance. We consider reasonable to install new rollaway beds since customers complain about existing, so this will be the contribution to performance improvement. Since microwaves repair is only $460 cheaper than new microwaves, we approve the microwaves replacement.

Stay Connected

Live Chat
Stay Connected

Curved shower rods would only add upscale appearance to bathrooms. Since there were no complaints from customers about the shower rods, we consider change superfluous. New televisions are out of scope for 2013. Although PTAC’s are old, they function and do not require repair. We recommend excluding the PTAC’s replacement from CPP.

It is unreasonable to invest $76,300 for PTAC and televisions when roof replacement is needed.

Soft goods renovation is $37,400 for 17 rooms, or $2,200 for one room. If it is necessary to meet the proposed CPP plan limit, we may recommend renovation for 10, 15, or another quantity of rooms.

 

Equipment

This section analyses the expenses for the equipment used outside the guestrooms (Table 4). Some of the items are operations expenses, and the table indicates that.

The items identified as operational expenses should be included in operational expenses (repairs & maintenance expenses).

 

Table 4

Equipment expenses

Item Cost Capital or operational expense Include in CPP for 2013
Guest coin-op laundry equipment $4,500 Capital No
Waterpark ozone system $15,000 Capital No
Kitchen grill $1,800 Operational Yes
Fire system - kitchen hood $11,000 Capital Yes
Sewage ejection pumps $1,500 Operational Yes
Guestroom corridor ice machines (5 ea) $12,000 Capital Yes

 

Customers do not complain about guest coin-op laundry equipment, so we consider calling off this investment. Waterpark ozone system (chlorine system replacement by ozone) is a local initiative; the old system functions properly. For 2013, due to repair works, this is annulled.

Benefit from Our Service: Save 25% Along with the first order offer - 15% discount, you save extra 10% since we provide 300 words/page instead of 275 words/page

Help

Kitchen grill and sewage ejection pumps can be designated as operational expenses since they are under the capital expenses threshold. However, we do recommend repairing these items in 2012.

Fire systems replacement is a part of the safety issue recommended by Fire Department. Many guests use ice machines, so these have to operate properly, and their repair is almost 60% of the new item price, so investment for the new ice machines is more efficient.

 

Premises Renovation Projects

The High County Management proposes several renovations. Some of them are ADA alternation; one is repair of the faulty structures while others are interior renovations. Table 5 lists the summary of the projects and recommendations.

Porte cochere repair is necessary as the structures are falling, and this is a safety issue. Partially, this is the appearance update. The main reason we insist on money allocation to this issue is safety.

We recommend swimming pool lifts installation and public restrooms alternations. These projects are due because of ADA regulations.

 

Table 5

Premises renovation projects

Item Cost Include in CPP for 2013
Porte cochere $20,000 Yes
Swimming pool lifts $18,000 Yes
Public restrooms alternations $50,000 Yes
Elevator interior $19,000 No
Restaurant soft innovation $40,000 No

 

Elevator interior and restaurant soft innovation are appearance issues. Hotel performance did not show any decrease in 2012, we presume that customers still value resort amenities. These innovations may be addressed in the next period since the other priorities are set for 2013.

VIP services

Get
extended REVISION from - $2.00
Get
SMS NOTIFICATIONS from - $3.00
Get an order
Proofread by editor from - $3.99
Get an order prepared
by Top 30 writers from - $4.80
Get a full
PDF plagiarism report from - $5.99
Get
VIP Support from - $9.99
Save up to 20%. VIP SERVICES
PACKAGE from - $23.82

 

We recommended some issues to be addressed as operational costs in 2012. Kitchen grill and sewage ejection pump repair have been  reallocated from CPP. We recommend including landscape renovation as it was damaged during the storm. We present data in Table 6.

 

Table 6

Item Cost
Kitchen grill repair $1,800
Sewage ejection pumps repair $1,500
Landscape renovation $1,500
Total $4,800

 

Summary

Analysis of the current situation of the Desert Volcano Lodge proves that proposed by High Country Management 2013 CPP requires revision. This is mainly due to storm damages and cost misallocation.

We reallocated the kitchen grill and sewage ejection pumps repair to operational costs.

Storm damaged the roof, caused water infiltration into interior walls, damaged guestrooms, landscapes and outbuilding. We recommend installing new metal roofing and tuckpointing the entire old building instead of spot repairs. If Western Partners plan to hold the resort, this is a reasonable investment. For the other damages, file an insurance claim, pay $2,000 deductible and insurance will cover $7,700 for the interior and outbuilding repair. Western Partners will have to allocate $1,500 for landscape renovation as operational cost for 3 years, approximately.

Top 30 writers

Your order will be assigned to the most experienced writer in the relevant discipline. The highly demanded expert, one of our top-30 writers with the highest rate among the customers

We suggest approving the items that are ADA compliance (swimming pool lifts, public restrooms alternations, handicapped guestroom bath changes) and Fire Department recommendations (fire system).

The other items in the Revised 2013 CPP are items that provide performance improvement. We reconsidered the items proposed by High Country Management and chose the items with the highest priority. The details are discussed in the appropriate sections of the report.

We aimed at meeting the total of High Country Management CPP.  Table 7 presents the Desert Volcano Lodge revised 2013 Capital Project Plan.

 

Table 7

The Desert Volcano Lodge: Revised 2013 Capital Project Plan

Item

Original Installation

Date

Cost Comments
Metal roofing system installing 1985 $135,000 Metal roofing provides benefits for the property, reasonable long-term investment
Tuckpointing the entire building n/a $40,000 Tuckpointing prevents water infiltration into the interior walls.
Porte Cochere 1993 $20,000 Replacement of the falling structures, update appearance
Swimming pool lifts n/a $18,000 ADA compliance
Public restrooms alternations n/a $50,000 ADA compliance
Soft goods for 16 guest rooms 2003 $35,200 Performance improvement. The amount was reduced to meet the CPP total, only 16 rooms will be renovated.
Guestroom window replacement 1985 $25,000 Performance improvement, energy-saving issue
Handicapped guestroom bath changes 1985 $20,000 ADA compliance
Guestroom corridor ice machines (5 ea) 1981/2003 $12,000 Performance improvement
Fire system - kitchen hood 1979 $11,000 Fire Department recommendations
New rollaway beds (5 ea) 1983 $3,000 Performance improvement
New microwaves (10 ea) 1985 $3,000 Performance improvement
Contingency   $2,000  
Total   $374,200  

 

The revised CPP will restore the areas damaged by storm, significantly renovates the old building and improve performance of the resort in 2013.

 

0

Preparing Orders

0

Active Writers

0%

Positive Feedback

0

Support Agents

What Our Customers Say

Now Accepting Apple Pay!
get 15% off your 1st order with code first15
Close
  Online - please click here to chat