Description of the project
The project is set to remove an old railway embankment which is adjacent to a canal with a high voltage electricity line and high pressure gas main crossing the site. The old railway embankment will be removed and two number 360° slew tracked excavators will then load some ten eight wheel tripper trucks. The excavated material will then be taken to a land fill site by the ten trucks.
Works sequence
In order to remove the old railway embankment, there are steps and activities that will be done so as to complete the work. First all the required equipment should be made available. These equipments are those that will remove the old railway embankment from the site and the excavators that will be used to load the excavated material to the trucks. These trucks should also be made available so that they will transport the excavated material to a land fill site. Second, the old railway embankment will be removed by the available equipments and personnel with a lot of care due to the presence of the high voltage electricity line and high pressure gas main crossing the site.
Resources
Man power is one of the vital resource that is going to be used in the whole project as expertise will be required in the removal of the embankment and in the operation of the machinery that are going to be used. The machines are also going to use fuel for them to be operated. Land is also going to be used as the excavated material will be damped into a land fill site.
Assessment of significant risks
There are risks that may impact the ability of this project to remove the old railway embankment. Some of the risks are the danger that the presence of the high voltage electricity line and high pressure gas main crossing the site posses to the group of people who will be involved in the task. There is also risk of the high cost that might be incurred in the process such that before the project is over there will be lack of finance to go on with the project. Accidents are also major risks in such scenario where there is use of machines and motor vehicles.
Control measures
A lot of caution should be taken by workers not to be in direct contact with the high voltage line since there is the danger of heart fibrillation. This may result to severe injury and even death. High pressure gas should be handled with a lot of care by following the necessary guidelines that should be followed when handling the gas cylinders. Drivers should also drive with a lot of care and those operating other machines should follow the guidelines provided.
Personal Protective Equipment
Everybody involved in the removal of the old railway line embankment should be in proper protective clothing. Other protective equipments that should be used in this project are the helmets, goggles and any other garget that will protect the wearer from any kind of body injury. These equipments reduce exposure of employees to hazards during their engineering work.